Start a conversation

How do I change multiple work statuses in Current Status Master Report?

Table of Contents :

How do I change multiple work statuses?

1. Login to your account using the username and password provided.
2. Hover over the Fleet Management tab and Click on Landing Gear Centre Tab.  
3. Click on the Landing Gear Sub-Assembly Fleet tab.
4. Select the asset from the grid.  
5. Hover over the Current Status dropdown and Select any tab from the dropdown. It will open a new window.
6. Hover over the REPORTS dropdown and Click on the Current Status Master Report option. It will open a new window.
7. In a new window, click on the view icon for the required row (located on the right-hand side of the grid).
8. Select required work status from 'Change Multiple Work Statuses to:' dropdown.
9. The select checkbox in front of All Pages.
10. You get an alert message. Now Click on OK button.
11. Click on the SAVE button.
12. You get an alert message. Now Click on the OK button.  
Choose files or drag and drop files
Was this article helpful?
Yes
No
  1. Lauren Partridge

  2. Posted
  3. Updated

Comments